Free parking during Eid holidays

Free parking during Eid holidays

Last updated:
2 MIN READ

Motorists can enjoy free parking from September 19 in Dubai as part of the Eid Al Fitr holidays, the Roads and Transport Authority (RTA) has announced.

Vehicles parked in paid parking zones will not be charged from 29th Ramadan/19 September up to the 3 Shawaal 1430H. Paid parking policy will be restored from 4 Shawaal (fourth day of Eid).

Engr Maitha bin Adai, CEO of RTA Traffic & Roads Agency, said: "The decision to exempt parking use during this blessed occasion is in line with RTA strategy to share all social events with the community and offer every possible comfort to the residents and visitors of the emirate during Eid days.''

Maitha called on parking users to avoid the disorderly use of the parking space during the exemption period.

The RTA also called on motorists to avoid occupying the parking space for extended periods, particularly in zones which are usually congested during such events, so as to enable all potential users benefit from the exemption.

She cautioned that offence tickets will be issued to violators who park on the pavement or make illegal parking blocking the front or rear sides of vehicles.

RTA clean-up

On the eve of Eid al Fitr, RTA has launched an extensive campaign to clean roads, public courts, parking spaces, bridges and tunnels as well as areas in the vicinity of such projects as part of the preparation for the advent of the Eid.
Dubai is visited by a massive numbers of visitors and tourists from the UAE or overseas during Eid and other events.
“The cleaning campaign covered areas around Eid prayer yards, mosques, bridges, and underpasses, particularly main tunnels. Cleaning process covered cleaning the metal rail of bridges, removing the sand and solid deposits from pavements (especially bridge pavements), and washing footbridges as well as the directional signs of key roads in the emirate,'' said Maitha.
She added: “A team of engineers and inspectors from Roads Maintenance Department, in coordination with Roads Dep't and Right of Way Services Department, has surveyed the areas around Eid Prayer yards earlier this month, and took corrective action towards rectifying any defects in roads, land marking, and directional signs.
“It also attended to cleaning road project sites and their surrounding areas to ensure they are clear from the construction waste, and the visibility of traffic signs and signals. The campaign ensured that contractors have the tools to carry out the required maintenance works, maintain the safety of road elements, and clean the tunnels and other facilities in all parts of the emirate to ensure they are turned out well during Eid days.

Sign up for the Daily Briefing

Get the latest news and updates straight to your inbox